g. Stand up rail section and fully lock the balusters into the rails. Place one foot on the top of the bottom rail, between second and third baluster while
g. Stand up rail section and fully lock the balusters into the rails. Place one foot on the top of the bottom rail, between second and third baluster while
g. Stand up rail section and fully lock the balusters into the rails. Place one foot on the top of the bottom rail, between second and third baluster while
at the same time placing a hand under the bottom of the top rail between second and third baluster. Push with foot and pull with hand until locking is
at the same time placing a hand under the bottom of the top rail between second and third baluster. Push with foot and pull with hand until locking is
at the same time placing a hand under the bottom of the top rail between second and third baluster. Push with foot and pull with hand until locking is
at the same time placing a hand under the bottom of the top rail between second and third baluster. Push with foot and pull with hand until locking is
complete (You should hear a snap). Repeat this process for the middle and end of the panel. All the balusters should now be "locked" into the top and
complete (You should hear a snap). Repeat this process for the middle and end of the panel. All the balusters should now be "locked" into the top and
complete (You should hear a snap). Repeat this process for the middle and end of the panel. All the balusters should now be "locked" into the top and
complete (You should hear a snap). Repeat this process for the middle and end of the panel. All the balusters should now be "locked" into the top and
bottom rails. (NOTE: If a snap is not heard or felt, use a rubber mallet to tap underneath of top rail to ensure
bottom rails. (NOTE: If a snap is not heard or felt, use a rubber mallet to tap underneath of top rail to ensure
bottom rails. (NOTE: If a snap is not heard or felt, use a rubber mallet to tap underneath of top rail to ensure
bottom rails. (NOTE: If a snap is not heard or felt, use a rubber mallet to tap underneath of top rail to ensure
a full connection.)
a full connection.)
h. Line up top rail profi le on top of the top rail. Press it down onto the top rail so it fi ts snug.
i. Slide bracket covers on ends of both top and bottom rails.
g. g. g.
5
5
Install support brace
a. Two support braces are included with 6' railing kits. For code purposes, only one is required for installations in the U.S., while all three
are required in Canada. Spread out the braces proportionately (place center one in middle).
b. Four support braces are included with 8' railing kits. For code purposes, only two are needed for installations in the U.S., while all four
are required in Canada. Spread out the braces proportionately.
6
6
Rails to Posts
a. Bring assembled rails between posts, elevated above brackets
assembled in Step 2.
b. Once centered, slowly lower rail assembly carefully to allow full
engagement between section and brackets in all four locations on
posts. NOTE: The top top rail profi le should rest on the bottom of the
bracket that is screwed into post
c. Attach brackets to rails – Predrill two holes from under the bottom of
the top rail through rail. Complete for each top rail bracket. Drive
#8x1
⁄
⁄" Pan Head screws (2 per bracket) through drilled holes.
⁄
" Pan Head screws (2 per bracket) through drilled holes.
1
2
2
2
2
7
7
Finishing Up
If using a pyramid post top, push to fasten on top of
posts. NOTE: A rubber mallet may be needed to
ensure tight connection.
5
h. h.
i.