RDI transform Instrucciones De Instalación página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

LEVEL RAIL WITH BOTTOM BEAM (OPTIONAL)
7.
Measure the finished opening space
between posts (Fig. 8) and cut the
bottom rail, bottom beam, and top beam
(components B, C, & D) to match this
measurement (Fig. 9).
Tip: Use a miter saw with a carbide tip
blade of at least 60 teeth.
6
8.
Insert mounting brackets (component
G) in each end of bottom beam if using,
(component C) and top beam (component D)
(Fig. 10).
Align bracket to end of beam. Measure 1"
from back of beam on inside side of rail only
and secure set screws (component J) into
beam (Fig. 11). This will secure the beam and
bracket together. Repeat for top beam.
NOTE: Pre-drilling is not necessary.
(Fig. 8)
(Fig. 9)
9.
Align the bottom beam with the marks
determined in Step 2.
Tip: Cut 2 wood blocks to the desired
bottom space height. This height should not
exceed 4". (Fig. 12). Place the blocks under
the ends of the rail against the posts.
Secure the lower bracket and beam to the
post using 6 mounting screws (component
K), 3 per bracket (Fig. 13). Begin with the
bottom center screw as shown to avoid
misalignment.
(Fig. 10)
(Fig. 11)
(Fig. 12)
(Fig. 13)
Tabla de contenido
loading

Productos relacionados para RDI transform

Tabla de contenido