Movement EDGE Manual De Montagem página 58

Puxada alta / baixa
Ocultar thumbs Ver también para EDGE:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLY
STEP 6: PASSING THE STEEL CABLE OF THE TOWER
Pass the steel cable over pulleys (1), (2),
(3), and (4), finalizing the cable tensioner.
3
41
25
31
40
Pass the steel cable through the pulley set
then mount the pulley with the cable already passed.
41
2
2
Load multiplier
Larger Steel
cable (A)
Lock pin
Start
4
1
2
07
31
25
26
28
28
2
07
27
24
4
42
This mark up
/left thread
33
Right thread
End
3
PART
02
PULLEY BRACKET
Bushing of the Shaft
03
45
Flat washer
07
45
Pulley finishing
Steel cable lock pin
25
26
Head Screw Cil. Hex Internal
27
Hex Nut
28
Beveled Sheave Cover
31
Pulley
Larger Steel cable
A
-
Load Multiplier
40
Head Screw Tab. Hex Int.
Pulley Cover
41
Do not use cables in these conditions
Cable with bird cage
Warped cable
Cabo entortado
Adjustment of the steel
cable. Use the (33) and
(42) locknut
to lock the steel cable.
Tools
Wrench 10 mm
Wrench 13 mm
DESCRIPTION
QTY.
-
1
-
1
M8
2
-
2
-
12
M8X55
1
1
M8
-
2
1
-
-
1
-
1
M6X16
1
-
2
Tabla de contenido
loading

Tabla de contenido