Loading the mulch sheet roll
2,5 mm
UN41-0325LI
To load the roll, proceed as outlined below.
1) Loosen the screws (A).
2) Spread out the disks (B) so that they are farther apart
than the width of the roll.
3) Lift and place the roll on the roller holder (D).
4) Position the roll in the centre of the work vehicle.
Night-time work or poor visibility conditions
Working at night or in poor visibility conditions increases
the risks arising from machine use; in these conditions,
Transporting the work vehicle
Danger - Warning
For work vehicle loading/unloading, use lifting
equipment with a suitable capacity for the load to be
lifted.
English language
INFORMATION FOR USE
C
5) Move the disks (B) towards the roll, maintaining the
distance shown in the figure.
6) Tighten the screws (A).
A spare roll can be loaded on the supports (C) for
when the roll in use ends during laying.
proper lighting must be provided to ensure safe work.
Danger - Warning
Use all possible caution when lifting to avoid damag-
ing the work vehicle and causing injuries to persons
involved in operations.
30
2,5 mm
C
D
Use and maintenance
6