Hotpoint Ariston HDAI Montaje Y Modo De Empleo página 28

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 61
12. Put the nuts equipped with fixing hooks inside the
EN
sections
of
correspondence with the rectangular slots. A total
of 14 nuts should be mounted.
13. Couple the two upper sections of the flue to cover
the trellis so that one of the slits present on the
sections is placed on the same side of the
command panel and the other on the opposite side.
Screw the two sections up with 8 screws (4 per side
– also see the plan diagram for coupling the two
sections).
14. Fix the upper flue set to the trellis near the ceiling
with two screws (one per side).
28
the
upper
and
lower
15. Couple the two lower sections of the flue to cover
flues
in
the trellis using 6 screws (3 per side - also see the
plan diagram for coupling the two sections).
16. Insert the lower section of the flue into the apposite
housing to cover the motor space and the electrical
connection box completely and fix with two screws
from inside the hood.
17. Apply the 2 tabs (supplied) to cover the fixing
points of the sections of the lower flue (ATTENTION!
THE
TABS
RECOGNISABLE
NARROWER AND LESS DEEP).
The larger and deeper tabs are those to use for the
upper flue and are to be cut to measure.
18. Supply the electrical power again acting on the
central electrical panel and check the correct
functioning of the hood.
FOR
THE
LOWER
FLUE
BECAUSE
THEY
ARE
ARE
loading

Este manual también es adecuado para:

HdsiHfiHdaHdsHfHdf