EVBOX WALL BOX Manual De Instalación página 13

Ocultar thumbs Ver también para WALL BOX:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
Part number: 9835663080
EN
2. Install wall dock
2.1
Select a solid and flat vertical surface for installing
the wall dock.
Ensure that the surface is even and solid enough to
resist a pull force of at least 100 kg.
2.2
Cut the drilling template from the packaging.
2.3
Place the drilling template onto the wall and use a
level device (e.g. bubble level) to align the template.
Mark the 4 mounting points on the wall and remove
the template.
2.4
Drill holes with a drill round 8 mm.
Use the provided 8x65 mm plugs.
2.5
Screw in the provided 5x70 mm screws using the
supplied torx T25 bit until the remaining distance
from the wall is 10 mm. This is necessary in order to
be able to hook on the wall dock.
Mount the wall dock onto the wall.
Fasten the 4 screws.
2.6
Remove the protective rubber cap.
Undo the 4 corner screws (3x Torx T20 using the
supplied T20 bit and 1x slotted using a regular flat-
head screwdriver).
Remove the transparent cover from the wall dock.
14
INSTALLATION_WALL_BOX_SOCKET_PSA_B2C_MERGED.indd 14
11-9-2019 8:29:51

Hide quick links:

Tabla de contenido
loading

Tabla de contenido