Part number: 9835663080
2. Install wall dock
Warning: Risk of electric shock.
Before installing the wall dock, make sure that the power line you're using is
switched off on your service panel.
Make sure that the power line to the wall box is installed on a dedicated circuit
breaker (MCB) on your service panel. The installation, including the residual-current
device (RCD), must be according to local regulations and IEC 60364. The MCB
rating must must not exceed the current rating of the
supply cable within the installation.
Note: In case the maximum current rating of the
current allocated for the
rating of the
wall box
their mobile device).
Be aware that local regulations may be applicable and may vary depending on your
region/country of residence. The installing party must always ensure that the wall
box is installed according to the local regulations.
The installation settings of your service panel must always be adjusted by a qualified
electrician.
Tools you need to install the wall dock
Sleeve with
drilling template
INSTALLATION_WALL_BOX_SOCKET_PSA_B2C_MERGED.indd 11
the
wall
box, the installer must adjust the internal current
using the EVBox Connect App (which must be installed on
Included
in the box
rubber seal
strain relief
4x screw
4x plug
1x bit T20
5 x 70 mm
8 x 65 mm
1x bit T25
1x bit T30
the
wall box
or the power
the
wall box
is higher than the
Not included
in the box
flat-head
bit-holding
screwdriver
screwdriver
drill
8 mm
knife
drill bit
bubble
level
mobile
device
11
11-9-2019 8:29:41
EN