Install The Range; Final Installation Checklist; Operation Checklist - mabe EME6063 Manual De Uso Y Cuidado E Instrucciones De Instalación

Quemadores eléctricos radiantes
Idiomas disponibles

Idiomas disponibles

INSTALL THE RANGE

10
LEVEL THE RANGE
A
Install the oven racks in the oven and position the
range where it is to be installed.
B
Check for levelness by placing a spirit level or a
cup, partially filled with water, on one of the oven
racks. If using a spirit level, take two readings - with
the level placed diagonally first in one direction
and then the other.

FINAL INSTALLATION CHECKLIST

• Check to make sure the circuit breaker is closed
(RESET) or the circuit fuses are replaced.
• Be sure power is in service to the building.
• Note (on some models): If the clock flashes "bad"
and then "LinE" with a loud tone, the neutral con-
nection to the range is miswired. Check the termi-
nal block connections and/or house wiring to
correct.
• Check to be sure that all packing materials and
tape have been removed. This will include tape
on metal panel under control knobs (if appli-
cable), adhesive tape, wire ties, cardboard and
protective plastic. Failure to remove these materi-
als could result in damage to the appliance once
the appliance has been turned on and surfaces
have heated.
• Check to make sure that the rear leveling leg is
fully inserted into the Anti-Tip bracket and that the
bracket is securely installed.
Installation Instructions
11

OPERATION CHECKLIST

• Turn on one of the surface units to observe that
the element glows within 60 seconds. Turn the unit
off when glow is detected. If the glow is not de-
tected within the time limit, recheck the range
wiring connections. If change is required, retest
again. If no change is required, have building wir-
ing checked for proper connections and voltage.
• Check to make sure the Clock (on models so
equipped) display is energized. If a series of hori-
zontal red lines appears in the display, disconnect
power immediately. Recheck the range wiring
connections. IF change is made to connections,
retest again. If no change is required, have build-
ing wiring checked for proper connections and
voltage. It is recommended that the clock be
changed if the red lines appear.
• Be sure all range controls are in the OFF position
before leaving the range.
51

Hide quick links:

Capítulos

loading