Installation; Inspection - KESSEL Staufix 091-040 Manual De Instrucciones De Instalación Y Funcionamiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49

2. Installation

Each device is supplied ready for operation
and need only be installed in a gravity fed
wastewater pipe.

3. Inspection

All KESSEL backwater valves should be in-
spected once a month by the operator or by
a representative of the operator.
GB
18
On both lockable backwater valves the emer-
gency flap should be checked by opening
and closing it several times.
Once the inspection is complete, be sure to
leave the manual locking lever in the „open"
position.
KESSEL
Tabla de contenido
loading

Tabla de contenido