Degassing The Pump; Automatic Degassing; Figure 8: Venting Of The Pump; Figure 9: Automatic Venting Of The Pump - DAB EVOSTA2 Instrucciones Para La Instalación Y El Mantenimiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 148
Once all the electrical and hydraulic connections have been made, fill the system with water and if necessary
with glycol (for the maximum glycol percentage see par. 4) and feed the system.
Once the system has been started it is possible to modify the operating modes to adapt better to the plant
requirements (see par.Error! Reference source not found.).

10.1 Degassing the pump

Always vent the pump before starting!
The pump must never run when dry.

10.2 Automatic Degassing

Automatic degassing occurs only for the Evosta3 pump. Hold down the Mode key for 3" and the function
starts: 1 minute at maximum speed, then it passes to the set mode.
ENGLISH

Figure 8: Venting of the pump

Figure 9: Automatic venting of the pump

43
Tabla de contenido
loading

Este manual también es adecuado para:

Evosta3Evosta2 sol

Tabla de contenido