General Instructions; Faucet Installation - T&S B-0177 La Instalación Y Las Instrucciones De Mantenimiento

Ocultar thumbs Ver también para B-0177:
Tabla de contenido

General Instructions

Nozzle Installation:
Note: Nozzles should be installed
first. See diagram below:
If installing to an existing rigid pre-
rinse unit or base faucet
1. Shut off water supply and drain
lines. Remove no.21 from no.2.
Apply Teflon tape or pipe joint
compound to threaded ends of
no.10.
2. Place no.10 into no.2 and tighten
firmly by hand.
21
11
10
2
To Install Swing Nozzle:
1. Insert no.14 into no.11 and rotate
to desired position at sink.
Note: See Repair Kit 011643-45 for
replacement of no.16 and no.17.
2. Tighten no.20 firmly with a wrench.

Faucet Installation:

1. Drill (2) two holes, approximately
1-1/4" diameter in countertop with 8"
centers, where you are installing
no.2.
2. Apply Teflon tape or pipe joint
compound to water supply lines.
14
3.Connect no.2 to water supply lines
20
by screwing no.3 (with eccentric
centers) onto nipple (supplied by
others) and tightening no.3 against
countertop. (Nut under countertop
to be supplied by others). Trim
supply lines if necessary.
water supply line
(supplied by others)
5
18
16
17
Enlarged View
8"[20 cm]
3
2
countertop
nut
Tabla de contenido
loading

Tabla de contenido