Mounting Brackets To Wall - Bradley 400 Serie Manual Del Usuario

Divisiones para baños con revestimiento de polvo y de acero inoxidable para montaje en el piso con soporte superior
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Powder Coated & Stainless Steel Restroom Partitions, Floor-Mounted with Overhead Brace — Series 400
2
Stirrup Brackets to Wall (Standard)
On end panel and pilaster applications, position the bracket
with the ear facing toward the inside of the stall.
Pilaster bracket is shown here; 1-1/4" opening brackets are
for pilasters, and 1" opening brackets are for panels.
Place the center of each stirrup bracket
A
at the established level line . Center the
bracket opening on the pilaster/panel
plumb line .
Using the bracket as a template, mark the
B
hole locations on the wall . Remove the
bracket and drill a Ø5/16" hole (min . 2"
[51mm] deep) at each hole location .
C
Insert the plastic anchors in all holes and
secure the brackets to the wall with the
#14 x 2" screws provided .
2a
Continuous Stainless Steel Brackets to Wall (Optional)
On pilaster applications, position the bracket with the ear
facing toward the inside of the stall.
Pilaster bracket is shown here; "Ear" brackets are for pilasters, and
"U" brackets are for panels.
Brackets are used as templates, but since the hole patterns
may be different, the brackets may not be interchangeable.
Place the bottom of each continuous
A
bracket at the established level line .
Center the bracket opening on the
pilaster/panel plumb line .
Using the bracket as a template, mark the
B
hole locations on the wall . Remove the
bracket and drill a Ø5/16" hole (min . 2"
[51mm] deep) at each hole location .
Insert the plastic anchors in all holes and
C
secure the brackets to the wall with the
#14 x 2" stainless screws provided .
6
3/21/2018
One-Eared
Bracket
"Ear"
Bracket
Bradley • HDWT-INSTR-009 Rev K; ECN 17-14-007
Installation
C L
Two-Eared
Bracket
C L
"U" Bracket
Tabla de contenido
loading

Tabla de contenido