EAS ELECTRIC E301WHF Manual De Instrucciones página 26

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

C. Installation instruction
Installation diagram (solar connection only available in the E301WHF model):
太阳能集热板1
Solar Collector1
Remark:
1. For the first time use, ensure the water tank have been filled with water before power on to prevent
burn out. Meanwhile, the circulation water pipe should be filled with water, no air left inside. Checking
the pipe to ensure the water circulates successfully.
2. Follow with the water heater unit, there are some installation parts (see the annex detail list of parts).
As for other water system components, the user or installation company should provide by themselves.
3. Before installation, it's better to reserve a water supply pipe interface, hot water outlet pipe interface
and drainage pipe interface. Among them, the water supply pipe and hot water outlet pipe should be
used in line with standards for drinking water pipes. (E.g. PPR pipe or stainless steel pipe, etc.), can
not use iron pipe or the rubber hose with odor for installation.
4. If the using place below 0
water tank), the heat-conducting medium should be anti-freezing liquid (propanediol suggested).
Make sure to insulate the water pipes to prevent frozen.
5. Air inlet /outlet can connect Φ153mm vent tube, but pipe should not be too long and less crankle.
Temperature Sensor
温度传感器
太阳能集热板2
Solar Collector2
Circulation Pump
循环水泵
单向阀
One-way Valve
(水或防冻液)
Water/anti-freezing Liquid
冷水进
Water Inlet
(自来水端)
Water Supply
℃ please adopt the second circulation system (connect solar coil in the
,
Air Outlet
出风
Vent Tube
Exhaust Valve
排气阀
溢流水管
Condensate Overflow drain
热水出
Hot Water Outlet
(用水端)
(Hot Water use)
Valve
阀门
冷凝水排出
Condensate water drainage
Filter
过滤器
安全阀
三通
Safety Valve Three-port Valve
Ball Valve
球阀
6
风管
CLOCK
ON/OFF
TIMER
MODE
排污管
Drainage Pipe
Air Inlet
进风
V.4

Hide quick links:

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

E302whf

Tabla de contenido