CEMO DWT Información Técnica página 76

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
GB
National Technical Approval
No. Z-40.11-280
National Technical Approval
No. Z-40.11-280
(5) Cleaning the inside of containers with solvents that degrade the container surface (e.g. for
an inspection) is not permitted. The accident prevention regulations, provisions governing the
(5) Cleaning the inside of containers with solvents that degrade the container surface (e.g. for
use of chemical cleaning agents and the disposal of cleaning waste shall be observed.
an inspection) is not permitted. The accident prevention regulations, provisions governing the
5.3
Inspections
use of chemical cleaning agents and the disposal of cleaning waste shall be observed.
5.3.1
Performance test/Pre-commissioning inspection
5.3
Inspections
(1) A performance test shall be performed after erection of the containers and installation of
5.3.1
Performance test/Pre-commissioning inspection
the necessary pipelines and safety devices. The test shall consist of a visual inspection,
(1) A performance test shall be performed after erection of the containers and installation of
water/air-tightness test, inspection/test of filling, ventilation and sampling lines and the fittings
and other equipment.
the necessary pipelines and safety devices. The test shall consist of a visual inspection,
water/air-tightness test, inspection/test of filling, ventilation and sampling lines and the fittings
(2) The performance test does not replace any pre-commissioning inspections required by
and other equipment.
the authorities in accordance with water management laws. However, they may be performed
at the same time.
(2) The performance test does not replace any pre-commissioning inspections required by
the authorities in accordance with water management laws. However, they may be performed
5.3.2
Ongoing Inspections/Inspections after commissioning
at the same time.
(1) The operator shall visually inspect the containers to ensure tightness at least once a
5.3.2
Ongoing Inspections/Inspections after commissioning
week. If problems with the seal are discovered, the unit must be taken out of operation
(1) The operator shall visually inspect the containers to ensure tightness at least once a
immediately and the damaged containers must be emptied, if applicable.
week. If problems with the seal are discovered, the unit must be taken out of operation
(2) If a leak indicator is connected to the interstitial space, the functionality of the leak
immediately and the damaged containers must be emptied, if applicable.
indicator must be checked in accordance with the relevant usability certificate issued by the
(2) If a leak indicator is connected to the interstitial space, the functionality of the leak
building authorities.
indicator must be checked in accordance with the relevant usability certificate issued by the
(3) This shall not affect inspections required by other areas of law.
building authorities.
(3) This shall not affect inspections required by other areas of law.
Holger
Eggert
Holger
Head of
Eggert
Division
Head of
Division
Z40365.16
Z40365.16
76
Page 11 of 11 | 22 July 2016
Page 11 of 11 | 22 July 2016
[Stamp]
[Stamp]
1.40.11-45/16
1.40.11-45/16
Tabla de contenido
loading

Este manual también es adecuado para:

744874497450745173727373 ... Mostrar todo

Tabla de contenido