GreenWorks Commercial GB 500 Manual Del Propietário página 10

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLy
ASSEMBLING THE BLOWER TUBE
WARNING
To prevent accidental starting that could cause serious personal injury, always remove the battery
pack from the tool when assembling parts.
1. Align either of the grooves on the tube with the tabs on the blower housing. Push the tube onto
the blower housing until the tab engages the grooves (fig. 2).
Tab
Tube
Groove
Fig. 2
2. Turn the tube in the direction of the arrow until both of the tabs slide into the lock positions .
Clockwise to Lock and Counter Clockwise to remove (fig. 3).
Unlock
Lock
Fig. 3
Lock position
10
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

2402602

Tabla de contenido