Collegamento A Vapore - Sabiana ATLAS C Manual De Instalación Y Mantenimiento

Tabla de contenido
AIX
E
V
Xport
COLLEGAMENTO
A VAPORE E
FLANGE SALDATE
Il collegamento a vapore
va eseguito
secondo questo schema:
IN = MANDATA
OUT = RITORNO
A = INSTALLAZIONE
A SOFFITTO
B = INSTALLAZIONE
A PARETE
1 - VALVOLA A SFERA
2 - FLANGIA
3 - FILTRO
4 - SCARICATORE
DI CONDENSA
PRESSIONE MAX.:
20 BAR.
14
AIX
E
V
Xport
STEAM
CONNECTION AND
WELDED FLANGES
The steam connection
is performed according to
the present diagram:
IN = FLOW
OUT = RETURN
A = CEILING
INSTALLATION
B = WALL
INSTALLATION
1 - BALL VALVE
2 - FLANGE
3 - FILTER
4 - CONDENSATE
DISCHARGER
MAXIMUM PRESSURE:
20 BAR.
Tabla de contenido
loading

Este manual también es adecuado para:

AixExport v

Tabla de contenido