Uline H-4897 Manual Del Usuario página 3

Bomba para cubeta de acero inoxidable
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION
1.
Determine if your pail has a 2" thread or pull-out
spout opening.
2. If it is a 2" thread, take collar (3) and screw directly
into pail (part 4 is not necessary)
3. If pull-out spout opening, screw part (3) into part (4)
4. Snap combined parts over metal ring on pail. To
remove from lid, use flat head screw driver and pry up.
5. Insert pump through hole, then tighten thumbscrew
to hold pump in place.
NOTE: Do not use wrench to tighten thumbscrew.
OPERATION
1. The pump is now ready for operation. Liquids should
begin flowing after a few upstrokes. If slight leakage
should occur, simply tighten packing nut on top of
the pump.
1
π
CHICAGO • ATLANTA • DALLAS • LOS ANGELES • MINNEAPOLIS • NYC/PHILA • SEATTLE • MEXICO • CANADA
PAGE 3 OF 9
INSTRUCTIONS
2. When pump is removed from drum, rinse thoroughly
MAINTENANCE
Normal maintenance is not required. If leaking occurs
and tightening the packing nut does not solve the
problem, then replace Handle Assembly (1).
WARRANTY
1-year limited warranty.
PARTS
2
3
4
#
DESCRIPTION
1
Handle Assembly
2
Body Assembly
3
2" Adapter and Screw
4
2⁄" Pail Adapter
1-800-295-5510
uline.com
NOTE: Tighten only enough to prevent leakage.
Excessive tightening will damage the packing
nut and cause more leakage.
in a liquid that is compatible with both the pump and
fluid. For questions about chemical compatibility,
contact your chemical supplier.
MATERIAL
ULINE PART NO.
PTFE, 316 S.S.
316 S.S.
Delrin
Polypropylene
MFG. PART NO.
-----------
2005-7P
-----------
2005-1C
H-4897-BUNG
1650-25
-----------
6009-258
0420 IH-4897
Tabla de contenido
loading

Tabla de contenido