8 . Routine maintenance plan
Perform the following operations and checks every 6 months according to intensity of use of the
automation.
Disconnect the 230 V~ power supply and batteries if present:
-
Clean and lubricate, using neutral grease, the turning pins, the hinges of the gate and the
drive screw
-
Check that fastening points are properly tightened.
-
Check the electrical wiring is in good condition.
Reconnect the 230 V~ power supply and batteries if present:
-
Check the power adjustments.
-
Check the good operation of all command and safety functions (photocells).
-
Check the good operation of the release.
-
If the E2HOB control panel is mounted, check for battery continuity by powering off and
performing several manoeuvres in sequence. Upon test completion, power back on (230 V~).
i
WARNING: For spare parts, see the spares price list.
37