Unloader; Pre-Start Inspection Procedures - Mi-T-M Corporation 37-1438 Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Operator's Manual
INSTALLATION & PREPARATION

UNLOADER:

The unloader has been preset at the factory.

PRE-START INSPECTION PROCEDURES:

Before starting the unit, perform the following procedures:
1. Check the oil level in the pump.
2. Inspect the water inlet strainer. Clean or replace if necessary. See "Water
Supply" pg. 14.
3. Check all hose connections to ensure they are securely tightened.
4. Inspect for system water leaks, oil leaks and fuel leaks. If a fuel leak is
found, DO NOT START UNIT! See "Risk of Explosion or Fire" warnings, pgs.
4-5. Be sure that all damaged parts are replaced and that the mechanical
problems are corrected prior to operation of the unit. If you require service,
contact Customer Service.
5. Inspect high pressure hoses for kinking, cuts and leaks. If a cut or leak is
found, DO NOT USE HOSE! Replace hose before starting unit. See "Risk
of Injection" warnings, pg. 6. Be sure that all damaged parts are replaced
and that the mechanical problems are corrected prior to operation of the
unit. If you require service, contact Customer Service.
END OF PREPARATION INSTRUCTIONS
15
Tabla de contenido
loading

Tabla de contenido