STEP 6.
To minimize air leaks and ensure optimal insulation, install
the included R1 insulation panel. (H in parts list) (See Figure
20 A-C).
First, measure the width from one side of the air condi-
tioner to the end of the side curtain. (See Figure 20A)
Next cut the R1 insulation panel to the measured width
and remove protective cover, exposing adhesive on
back panel (See Figure 20B)
Last, evenly apply the adhesive side of the panel to the top
and botom of the side curtain frame. (See Figure 20C)
Repeat the step above for the other side curtain frame.
Figure 20
A
B
C
Cut the window seal gasket (C in parts list) to match the
STEP 7.
window width and insert it between the window sashes
as shown in Figure 21.
Figure 21
Plug in unit.
STEP 8.
.
Now that installation is complete, your unit is ready to operate!
Simply plug in the power cord and follow the operation steps
outlined in this manual or your QuickStart Guide.
CIRCUIT PROTECTION - If the air conditioner is circuit protected by a fuse,
use a "TIME DELAY" fuse or HACR type circuit breaker due to momentary
high current demand when your air conditioner is started. Before operating
your unit, verify the ampere rating of the time-delay fuse or circuit breaker
which protects your unit. The ampere rating of the time-delay fuse or circuit
breaker shall be 15 amps
Replacement Installation Instructions
Your new Kühl Q chassis will fit in all previous Friedrich Q-size
sleeves. Replacement installation instructions are the same for
both window and thru-the-wall.
Inspect your existing Friedrich Q-size sleeve to ensure it is
properly installed and in good condition.
Remove adhesive backing from supplied shell gasket (D in parts list) and
place along the bottom sill channel, centered, extending up the sides of
the shell. (see Figure 22).
Remove the new Kühl Q chassis from the new sleeve (as outlines
in STEP 5.1 on page 17).and insert into previously installed sleeve.
Obtain assistance as needed.
Figure 22
SHELL GASKET (ITEM D).
19