Start Up; Preliminary Checks; Water Treatment; Filling The System - Biasi RCB 3S Manual De Instalación, Uso Y Mantenimento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5

START UP

WARNING: Before start up insert wholly turbolators into the smoke tubes ensuring that they have
been pushed inside for at least 100 mm.
5.1

PRELIMINARY CHECKS

Before starting the boiler, check that:
-
The rating plate specifications and power supply network (electricity, water, gas or fuel oil) specifica-
tions correspond;
-
The burner power range is compatible with the power of the boiler;
-
The boiler room also contains the instructions for the burner;
-
The flue gas exhaust pipe is operating correctly;
-
The air inlet supply is well dimensioned and free from any obstacle;
-
The manhole, the smokebox and the burner plate are closed in order to provide a complete flue gas
seal;
-
The system is full of water and that any air pockets have therefore been eliminated;
-
The anti-freeze protections are operative;
-
The water circulation pumps are operating correctly.
-
The expansion vessel and the safety valve(s) have been connected correctly (with no interception) and
are properly operating.
-
Check the electrical parts and thermostat operation.
5.2

WATER TREATMENT

The most common phenomena that occur in heating systems are:
-
Scaling
Scale obstructs heat transfer between the combustion gases and the water, causing an abnormal in-
crease in the temperature of the metal and therefore reducing the life of the boiler.
Scale is found mostly at the points where the wall temperature is highest and the best remedy, at con-
struction level, is to eliminate areas that overheat.
Scale creates an insulating layer which reduces the thermal transfer of the generator, affecting system ef-
ficiency. This means that the heat produced by burning the fuel is not fully exploited and is lost to the flue.
Scale diagram
Key
%
% fuel not used
mm
mm scale
-
Corrosion on the water side
Corrosion of the metal surfaces of the
boiler on the water side is due to the passage of dissolved iron through its ions (Fe+). In this process the
presence of dissolved gases and in particular of oxygen and carbon dioxide is very important. Corrosion
often occurs with softened or demineralised water which has a more aggressive effect on iron (acid water
with Ph <7): in these cases, although the system is protected from scaling, it is not protected against cor-
rosion and the water must be treated with corrosion inhibitors.
5.3

FILLING THE SYSTEM

The water must enter the system as slowly as possible and in a quantity proportional to the air bleeding ca-
pacity of the components involved. Filling times vary depending on the capacity and characteristics of the
system but should never be less than 2 or 3 hours. In the case of a system with closed expansion vessel,
water must be let in until the pressure gauge indicator reaches the static pressure value pre-set by the ves-
sel. Heat the water to maximum temperature. During this operation the air contained in the water is released
through the automatic air separators or through manual bleed valves. The water discharged from the system
with elimination of the air is made up by the automatic or manual filling valve.
ENGLISH
52
Tabla de contenido
loading

Este manual también es adecuado para:

Rcb 3s m

Tabla de contenido