Husky 1001574056 Manual Del Usuario página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Operation Instruction
Ball valve
X
Ball valve
How to start up
Close the air tank drain valve (G) by turning clockwise.
Plug in the power cord (X).
Set the ON/OFF switch (I) to the I (on) position and allow
tank pressure to build. Motor will stop when tank pressure
reaches "cut-out" pressure.
Turn the air pressure regulator (G) clockwise until
desired pressure is reached.
The compressor is ready for use.
How to shut down
Set the ON/OFF switch (I) to the O (off) position.
Unplug the power cord (X).
Reduce the pressure in the tank through the outlet hose. Pulling the pressure relief valve ring
(H) and keeping it open will also reduce the pressure in the tank.
Tip the compressor so the tank drain valve is at the bottom of the tank, then open the tank
drain valve counterclockwise to allow moisture to drain from the tank.
9

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

0300813a

Tabla de contenido