Elecro VULCAN Manual De Instalación Y Funcionamiento página 4

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
Positioning
Your heater must be horizontally or vertically sited allowing suffi cient
space for pipe connections and wiring, it should be screw fi xed securely to
a fi rm base or wall.
NOTE: See fi gure 2 for details of the foot arrangement when securing
to the wall or fl oor.
Floor mount 'Foot position'
Fig 2.
Factory set fl oor
mount 'Foot position'
To reset for wall
mount option,
undo the bolts and
re-assemble in the
vertical position as
shown.
Wall mount 'Foot position'
The heater should be installed at a low point in the fi ltration system.
It should be positioned downstream (after) of the fi lter and upstream
(before) of any dosing or other water treatment plant. (see fi g.3)
NOTE : If the fl ow direction is reversed (explained later in this
booklet) the heater must remain sited after the fi lter.
2
Tabla de contenido
loading

Productos relacionados para Elecro VULCAN

Tabla de contenido