ASSEMBLY
STEP 9 - FRACTIONATED WEIGHT ADJUSTMENT
24
Name
Cable tensioner
F
Name
Steel Cable
Q
Name
Steel Cable
25
Name
Cable locknut
M8
THE RIGHT POSITION TO ASSEMBLE
THE CABLE TENSIONER (24), IS
INDICATED BY THE FRIEZE PLACED IN
ITS EXTEMITY.
(Figure 9-3)
CAREFULL TO NOT PASS THE CABLE UP
THE SCREWS, IN CASE IT HAPPENS THE
CABLE WILL BE DAMAGEG IN THE USE
OF THE EQUIPMENT.
(Figure 9-4).
THE CABLES SHOULD ADJUSTED AS
QTY
1x
DESCRIBED IN THIS MANUAL AND
CHECKED DAILY TO NOT ESCAPE
FROM THE TENSIONER AVOIDING
POSSIBLES INJURIES WITH TE USER.
QTY
1x
Q
24
25
F
Figure 9-1
Q
Figure 9-3
Figure 9-5
X cm
The same distance of
the cables in the
tensioner and the load
multiplier, the chable
should be put
at the same time
X cm
24
Figure 9-2
TO regulate the
cable tighten or
slack the
tensioner (24).
24
24
25
25
F
Frieze
Figure 9-4