Establishing The Electrical Connection En; Electric Shock; Operation - Abicor Binzel FES-200 W3 Manual De Instrucciones

Ocultar thumbs Ver también para FES-200 W3:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7 Operation

6.3 Establishing the electrical connection
WARNING

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
Mains cable and mains plug are pre-mounted. For the mains voltage and the fuse protection, please refer to:
 3.1 Technical data on page EN-8
 3.3 Nameplate on page EN-9
1 Plug in the mains plug.
7 Operation
WARNING
Health risk caused by harmful dust
Before and during operation, please observe the following:
• The fume extraction system must not be operated with an open dust collecting drawer.
• During operation and fume extraction, the complete fume extraction system must be kept closed.
• After having switched off the fume extraction system, wait at least one minute before opening the cover of the dust
collecting drawer.
WARNING
Hazard due to overheating
Increased wear to the electric motor due to overheating.
• A cool-down period of at least 5 minutes must be observed for every 30 minutes of operating time.
• This value may change depending on the ambient temperature of max. 25°C.
NOTICE
• Use the FES-200 W3 fume extraction system only in areas with sufficient ventilation.
• After each use, the dust collecting drawer must be checked.
• In case of a filling level of 2/3 or more, the dust collecting drawer must be emptied according to the regulations.
 5.1 Emptying the dust collecting drawer on page EN-12
 Fig. 9 Control elements on page EN-19
1 Plug the mains plug into the socket.
2 Set the rocker switch (2) on the fume extraction system to the Manual position.
EN - 18
FES-200 W3
BAL.0335.0 • 2019-08-16
Tabla de contenido
loading

Productos relacionados para Abicor Binzel FES-200 W3

Tabla de contenido