Ceiling ducting
If the duct will vent straight up to the ceiling:
•
Use level to draw a line straight up, from the centerline on the template to the ceiling.
•
Measure at least 4 -12/16 " from the back wall to the circle center of an 8-½" hole on the ceiling.
Wall ducting
If ductwork will vent to rear:
•
Use a level to draw a line straight up from the centerline on the template.
•
Measure at least 23 - 12/16" (the measure might vary dependig on the elbow used) above the pencil line
that indicates the bottom installation height, to the circle center of an 8-½" diameter duct hole (Hole may
be elongated for duct elbow).
House wiring location
•
The junction box is located on the top left side of the hood.
•
Wiring should enter the back wall at least 20" above the bottom of the installation height, and within
5-7/8" and 4-7/8"of the left side of the centerline.
•
Use for the installation 1/2" trade size UL listed metal conduit.
Install framing for hood support
•
If drywall is present, mark the screw hole locations.
Remove the template.
•
Cut away enough drywall to expose 2 vertical studs
at the holes location indicated by the template.
Install two horizontal supports at least 4" X 2"
between two wall studs at the bottom mounting holes
installation location.
•
The horizontal support must be flush with the room
side of the studs.
Use cleats behind both sides of the support to
secure to wall studs.
•
Reinstall drywall and refinish.
IMPORTANT
Framing must be capable of supporting 100 lbs.
WARNING
•
When installing to drywall the wall fastener anchors
shall not be used. Disregard the installation steps
referring to wall fastener anchors in the following
instructions.
8
1
/
"
2
8
/
"
1
2
23
/
12
30" Gas Cooktop (minimum)
24"-30" Electric Cooktop (min)
4
/
" (At least)
12
16
"
16
8-1/2" min. opening for ductwork
4"x2" Min. Mounting Support