Duct Fittings - ELICA etb436ss Guía De Instalación, Uso Y Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

IMPORTANT. Check to be sure that holes locations are
leveled, and correctly centered by the vertical centerline.
(This installation instruction applies for concrete wall).
Drill 5/16" pilot holes in the marked locations.
Install wall fastener anchors.
Drive wood screws, by hand, into the fasteners to allow
anchors to expand. Remove screws.
Secure the bracket to the wall with wood screws and/or
fasteners.
Option B - Telescopic duct cover
The duct bracket should be installed against the back wall
and flush with the ceiling. This bracket will hold the duct
cover in place at the top (this a extra accessory available
not included with the hood).

DUCT FITTINGS

Use this chart to compute maximum permissible lengths for
ducts runs to outdoors.
NOTE: Do not exceed maximum permissible equivalents
lengths!
Flexible ducting:
If flexible metal ducting is used, all the equivalent feet values
in the table should be doubled. The flexible metal duct should
be straight and smooth and extended as much as possible.
DO NOT use flexible plastic ducting.
Duct piece
Dimensions
Equivalent
Lenght
Round,
1 ft. (per foot
straight
lenght)
3-1/4" x 12",
1 ft. (per foot
3-1/4" x 24"
lenght)
straight
8" round, 90°
15 ft.
elbow
8" round, 45°
8 ft.
elbow
3 - 1/4" x 12",
11 ft.
90° elbow
3 - 1/4" x 12"
6 ft.
or 45° elbow
3 - 1/4" x 12",
24 ft.
90° flat elbow
8" round to
1 ft.
3-1/4" x 12" or
3-1/4" x 24"
transition
Secure the bracket to the wall:
NOTE: Any home ventilation system, such as a ventilation
hood, may interrupt the proper flow of combustion air and ex-
haust required by fireplaces, gas furnaces, gas water heaters
and other naturallly vented systems. To minimize the chance
of interruption of such naturally vented systems, follow the
heating equipment manufacturer's guidelines and safety stan-
dards such as those published by NFPA and ASHERAE.
Quantity
Total
Duct piece
Used
Equivalent
Lenght
7
Align the marked centerline on the bracket with the
centerline on the wall.
Mark 2 screw hole locations in the wall.
Drill 5/16" pilot holes in the marked locations.
Install wall fastener anchors.
Drive wood screws, by hand, into the fastener to allow
anchors to expand. Remove the screws.
Secure the bracket to the wall with wood screws and/or
fasteners.
Wall
This hood must use an 8" round duct.
Dimensions
Equivalent
Lenght
3-1/4" x 12"
8ft.
to 8" round
transition
8" round to
16 ft.
3-1/4" x 12" or
transition 90°
elbow
3-1/4" x 12"
17 ft.
to 8" round
transition 90°
elbow
8" round
30 ft.
wall cap with
damper
3-1/4" x 12"
30 ft.
wall cap with
damper
8" round roof
26 ft.
cap
8" round roof
26 ft.
vent
Quantity
Total
Used
Equivalent
Lenght
Tabla de contenido
loading

Tabla de contenido