Measures For Putting The Appliance Into Operation; Decommissioning, Storage And Recycling - Hupfer SGR Manual Del Usuario

Ocultar thumbs Ver también para SGR:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 192
Transport, Installation, Initial Operation and Taking out of Service

Decommissioning, Storage and Recycling

Electrical connections SPV/SGR
Control system and
power distribution
Number of 230 V
sockets
Electrical supply
Cable cross section
Q
The cable cross sections given above are a recommendation of
depending on the length and consumption can vary considerably.
4.3.2

Measures for Putting the Appliance into Operation

There should be no loads on the system while putting it into operation.
Check the following while putting the conveyor system into operation to ensure the safety:
§
Pay attention to unusual noises.
§
Check whether the belt runs properly (readjust the belt, if necessary).
§
Conveyor system, light barrier and limit switch must be free of foreign objects.
§
Unlock the Emergency stop button.
§
Set the potentiometer.
The conveyor system may be put into operation once its correct functioning has been ensured.
4.4
Decommissioning, Storage and Recycling
Proceed as follows to take the conveyor system out of operation:
§
Take the conveyor system out of operation and secure it against unauthorised reactivation.
§
Switch off the conveyor system and the motor at the mains.
The conveyor system must be kept in a dry, frost-free environment when placed in temporary storage. The
conveyor system must be kept covered with a suitable covering material to be protected against dust
ingress.
The appliance kept in the storage location must be checked for damage and corrosion every 6 months.
NOTE
Before the appliance is taken back into operation, it must be clean and dry.
To dismantle the conveyor system, proceed as follows:
§
Remove the belt.
§
Dismantle the control and operating controls.
§
Dismantle the conveyor system starting with the first segment at the beginning of the belt system.
§
Dismantle all segments up to the end of the belt system.
§
Clean the machine parts to remove used lubricants.
§
Remove all seals from the bearings.
§
Separate all the plastic, electronics and metal parts from each other.
4330053_A7
SGR
SPV cold
-
0
230V~, N/PE
230V~, N/PE
3x2.5 mm²
3x2.5 mm²
Condensation
Ensure that there is sufficient ventilation and no major variations in
temperature in the storage location to prevent condensation from forming.
SPV-I
SPV-II
8
12
400V 3~, N/PE
400V 3~, N/PE
5x6.0 mm²
5x10.0 mm²
®
HUPFER
. Dimensions of cross sections
Section 4
Page 25
SPV-III
18
400V 3~, N/PE
5x16.0 mm²
Belt Conveyor System
SGR | SPV
Tabla de contenido
loading

Este manual también es adecuado para:

Spv

Tabla de contenido