Panasonic U-16GE3E5 Procedimientos Y Puntos Técnicos Para Trabajo De Cableado Eléctrico página 8

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
C – 2 In the case of a 3WAY Multi (Fig. 10)
φ
1
220 - 240V
Earth leakage
circuit breaker
Outdoor
power cable
* When connecting indoor/outdoor control cables, no more than
two cables should be connected to a single terminal section
on the terminal board. If you need to connect a third or forth
cable, connect the cables to 3 and 4 on the terminal board.
Outdoor
Indoor
unit
unit
1
1
*
Solenoid
valve kit
(purchased
separately)
White
Indoor power cable
(purchased
separately)
Remote controller
Earth leakage
circuit breaker
φ
1
220 - 240V
Fig. 10 Electrical Wiring System Diagram
EN - 8
Indoor/outdoor
control cable
Indoor
unit
2
Solenoid
Solenoid
valve kit
valve kit
(purchased
(purchased
separately)
separately)
Black
White
Black
(purchased
separately)
Remote controller
Earth leakage
Earth leakage
circuit breaker
circuit breaker
φ
φ
1
220 - 240V
1
220 - 240V
Indoor
Indoor
unit
unit
3
4
Solenoid
valve kit
(purchased
separately)
White
Black
White
(purchased
(purchased
separately)
separately)
Remote controller
Remote controller
Earth leakage
circuit breaker
φ
1
220 - 240V
Black
Tabla de contenido
loading

Este manual también es adecuado para:

U-20ge3e5U-25ge3e5U-30ge3e5U-16gf3e5U-20gf3e5U-25gf3e5

Tabla de contenido