Speck BADU OmniTronic Traducción De Las Instrucciones Para El Manejo Originales página 50

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 228
Table of contents
3.3.8
Digital inputs ........................................................................ 20
3.3.9
Parameter and battery ......................................................... 21
3.3.10
Level regulation ............................................................... 21
3.3.11
Output to Eco VS pump ................................................... 22
3.3.12
Display wall assembly ..................................................... 22
3.4
Pressure switch ....................................................................... 22
3.5
4
Transport and intermediate storage ............................................. 23
5
Installation ...................................................................................... 24
5.1
Installation site ........................................................................ 24
5.1.1
Installation ........................................................................... 24
5.1.2
There must be ground drainage .......................................... 24
5.1.3
Ventilation and aeration ....................................................... 24
5.1.4
Reserve space .................................................................... 24
5.2
Installation ............................................................................... 24
5.2.1
Connecting the valve to the pipework .................................. 25
5.3
Electrical connection (Qualified specialist) .............................. 26
5.3.1
Replacing the fuses ............................................................. 27
5.3.2
Terminal connection table ................................................... 27
5.3.3
Connection diagram ............................................................ 28
5.3.4
adapter ................................................................................ 29
5.3.5
filter control .......................................................................... 29
5.3.6
6
Commissioning/Decommissioning .............................................. 31
6.1
Commissioning ........................................................................ 31
6.2
Functional test ......................................................................... 31
6.2.1
Test cycle ............................................................................ 31
6.2.2
Shut-off valves .................................................................... 31
7
Faults/troubleshooting .................................................................. 32
7.1
Overview ................................................................................. 32
7.2
Replacing parts/modules ......................................................... 35
7.2.1
Replacing the upper part ..................................................... 35
7.2.2
Side openings ..................................................................... 36
4 EN
05|2018
Tabla de contenido
loading

Tabla de contenido