Gemini GEM-P400 Manul De Operacion página 75

Tabla de contenido
Water Connections continued-
INSTALLATION INSTRUCTIONS FOR INLET/OUTLET
PIPE INSULATION & TEMPERATURE/PRESSURE
1. If included, install 2 ft. pipe insulation over both cold and hot outlet
pipes.
2. If included, install temperature & pressure relief valve insulation over
temperature & pressure relief valve.
Note: The water heater may only have one T&P location.
RELIEF VALVE INSULATION
11
Tabla de contenido
loading

Tabla de contenido