1.
Prepare the Site
Finished Wall
Mur fini
Pared acabada
NOTICE: Refer to the "Roughing-In" section throughout this procedure to prepare the
site.
Front notch the studs, then secure 2x6 backing material to the studs with framing
nails.
Install the water supplies and drain piping. Install the supply stops at a location
where the handles will not make contact with the console table legs when the
handles are fully open.
Complete the finished wall. Ensure the finished wall is straight and the floor is
level and perpendicular to the finished wall.
Level and hold the hanger in position. Secure the hanger with lag bolts (not
provided).
NOTICE: The product can break, chip, or cause injury if handled carelessly. Do not
allow the hanger to support the weight of the lavatory. Get assistance lifting and
holding the lavatory in place while you mark the mounting holes on the underside of
the lavatory.
With assistance, lift and hold the lavatory on the lip of the installed hanger. Verify
the lavatory is properly positioned and is level. Adjust the lavatory, if needed.
Mark the two mounting holes on the underside of the lavatory. Lift the lavatory
off the hanger, then set the lavatory aside.
Verify the marks are level with one another.
Using a 1/4" drill bit, drill pilot holes at the marks.
Kohler Co.
Mounting Holes
Orifices de fixation
Orificios de fijación
2x6 Backing Material
Matériau de renfort 2x6
Listones de refuerzo de 2x6
Hanger
Étrier de support
Soporte de suspensión
5
Lag Bolts
Tire-fonds
Pernos de fijación
1007272-2-C