Initial Setup; Operation; Storage; Loading The Filling Station - CEMO KS-Mobil 400 l Manual De Instrucciones

Idiomas disponibles
  • ES

Idiomas disponibles

GB

4. Initial setup

1. Affix the enclosed stickers to the front of the
KS-Mobil 400 l.
Fig. 4.1: KS-Mobil 400 l labelling
Fig. 4.2: KS-Mobil 600 l / 980 l labelling on both sides
(front and rear)
A
UN 1203 for petrol
Hazard label
B
(flame on red background)
22
B
A
B
A
2. Fill the tank (see section 5.4).
Screw cap f onto filling connection. The contai-
ner is filled with a fixed filling connection. The
limiting value transmitter j must be connected.
The limiting value transmitter is factory-set to a
95 % filling.
The ventilation pipe must be installed in
order to fill the container.
3. Perform a test filling as described in section 5.5,
but hold the outlet manifold or delivery nozzle m
in the open filling opening f.
4. After completing the test filling, close the filling
opening tight using the cap.
The filling station is now ready for operation.

5. Operation

5.1 Storage

Do not expose the KS-Mobil to direct sunlight for
extended periods either during transport or when in
storage. Excessive heating can degrade the quality
of the high-grade plastic container.
If heating produces overpressure in the sealed
container, this overpressure will be released via the
safety valve i .
Suitable storage conditions:
• ambient temperatures from - 10 °C to + 40 °C.
• level surface
• canopy for storage outdoors

5.2 Loading the filling station

Risk of injury!
Door of the pump cabinet a must be
closed.
Important!
i
the ventilation pipe b must be removed
for loading/transport.
­ seal coupling c with blind cover
­ close the ball valve of the delivery line g
loading

Este manual también es adecuado para:

Ks-mobil 600 lKs-mobil 980 l