Fleck 3200 NT Manual De Uso página 20

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

1 - GENERAL OPERATION
2
Service operation
Timeclock delayed valve
2.1
In Service, only the time of day is visualised. The valve operates normally until the amount of
days needed since the last regeneration is reached. Once the amount of days is reached, the
valve will regenerate at the set time.
Metered valve
2.2
In service, the time and remaining volume will appear alternatively. The water flow is indicated
by a L.E.D. that flashes proportionally with the flow. The volume remaining reduces with water
consumption.
Meter delayed regeneration
2.3
The system memorises the volume of water used. If the system determines there will not be
enough capacity for the next days consumption, a regeneration will start on set time.
Meter immediate regeneration
2.4
As soon as the volume remaining reaches zero, the regeneration starts immediately.
Calendar forcing function
2.5
If the calendar forcing is activated and the valve has reached the number of programmed days
without regenerating, a regeneration will be done regardless of the left capacity.
3
Service during regeneration
During regeneration, the valve indicates the current cycle number as well as the time left. When
the cycle time reaches zero, the valve switches to the next cycle. As soon as the regeneration
cycles are finished, the valve goes back to service position.
The number 1 flashes, the valve goes to cycle 1
Press the
4
Operation during a power cut
During a power cut, all data will be saved, without loss, to be restored once the electricity is
back. The electronics will be inoperative and all regeneration will be delayed. A wrong time
display will indicate that there has been a power cut.
19
Volume remaining
button during regeneration allows forwarding directly to the next cycle.
time of day
The valve is in cycle 1, there is less than 10 min.
E
N
G
L
I
S
H
3200 NT
Tabla de contenido
loading

Tabla de contenido