Hitecsa EQU-PF 233 Manual De Instalación, Uso Y Mantenimiento página 19

Ocultar thumbs Ver también para EQU-PF 233:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

II.7.2.5
Checks to be made with the unit running
Intervention test: use the
water gate valves to
reduce the flow to the
evaporator.
START
Ask all unauthorised personnel to leave the area.
 YES
Does the water differential pressure switch trip

regularly?
 YES
Is the working pressure reading correct?
 YES
If you take the pressure on the high pressure side to
approx. 8 bar, are there gas leaks > 3 grams/year?
 NO
Do alarms appear on the unit display?
 NO
Starting procedure completed!

21
SECTION II: INSTALLATION AND MAINTENANCE

NO
Check the component and/or
replace it if necessary.
Stop the unit and verify the cause of
 NO

this anomaly.
Stop the unit and verify the cause of
 YES

the leak (according to EN 378-2).
 YES

Check the cause of the alarm.
See the alarm table.

Capítulos

Tabla de contenido
loading

Tabla de contenido