Tools And Materials Required; Damage - Shipment/Installation; Parts Included - GE KITCHEN HUB UVH1301 Manual Del Propietario E Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)
Pencil and tape measure
Level
Rectangular duct and
adaptors as needed per
installation
(length will vary)
Tin snips
Electric drill with #2 Phillips bit
Saw (saber, hole or keyhole)
Drill bits: 2", 3/16", 5/8"
12
Installation Instructions
Safety glasses
Phillips screwdriver
Aluminized
duct tape
Gloves
Scissors (to cut
template, if necessary)
Filler blocks or scrap
wood pieces, if needed
for top cabinet spacing
(used on recessed
bottom cabinet
installations only)
PARTS NEEDED FOR INSTALLATION
1 Wall or Roof Cap (for ducted venting only)
All Metal Ductwork (for ducted venting only)
DAMAGE – SHIPMENT/INSTALLATION
• If the unit is damaged in shipment, return the
unit to the store in which it was bought for repair or
replacement.
• If the unit is damaged by the customer, repair or
replacement is the responsibility of the customer.
• If the unit is damaged by the installer (if other
than the customer), repair or replacement must
be made by arrangement between customer and
installer.

PARTS INCLUDED

HARDWARE PACKET
PART
Wood Screws
(3/16" x 2")
Toggle Bolts (and
wing nuts) (1/4" x 3")
Self-aligning
Machine Screw
(1/4"-28 x 3-1/4")
Nylon Grommet (for
metal cabinets)
Power Cord Strap
(plastic)
You will find the installation hardware contained in a
packet with the unit. Check to make sure you have
all these parts.
NOTE: Some extra parts are included.
QUANTITY
2
4
3
2
1
49-2000492 Rev. 2
Tabla de contenido
loading

Tabla de contenido