WMB TE-086 Manual De Instrucciones página 14

Ocultar thumbs Ver también para TE-086:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Operating instructions
4. Operation.
4.1 - In order to place the elevator tower in
their working location, put the tower leaned in
their transport wheels (T) on a hard and level
surface.
4.2 - Get on the legs (P) of their support for the
transport (S) and insert them in their working
lodging (V) verifying that they are tightly
fastened by the safety catches (R).
4.3 - Adjust the vertical position of the tower by
means of the disc feet supports (Q) rotating the
hand crank (H) in the necessary direction to
manage that the bubble of the spirit level (F)
stays centred in the circle.
4.4 - Release the profiles turning the retention
crank nob PR. Put the load on top of the tower
using the suitable support, in order to make
work the weight of the load only in the vertical
direction. The minimum load must be 25 Kg.
The load will be automatically locked in any
position.
4.5 - Lifting:
Raise the lift turning the hand crank of the
winch (W) clockwise (N
desired height.
PRO LIFTS S.L.
), lifting the load up to
1
ENGLISH
4.6 - Lowering:
When lowering the towerlift you must lift
the load some cm until the ALS lock becomes
free. Then pull up the locking pin on the ALS
safety catch (M1) and rotate the hand crank of
the winch counterclockwise (N
load until the profile is completely folded.
Repeat the above process to each section until
all are completely lowered.
Pull up the locking pin on the ALS safety catch
(M2) and continue lowering the tower until this
second profile is completely folded.
Pull up the locking pin on the ALS safety catch
(M3) and continue lowering the load until the
third profile is completely folded.
Pull up the locking pin on the ALS safety catch
(M4) and continue lowering the load until the
towerlift is completely folded down to its
minimum height.
The towerlift can be left in any intermediate
position which would be necessary.
4.7 - To transport the lift you must lower all the
profiles completely, locking them with the
retention crank nob PR. Get out the legs lifting
the blockade on the catches and put them in
their transport lodging (S).
v11.02 - Depósito legal y Copyright 2011. Todos los derechos reservados.
) lowering the
2
Tabla de contenido
loading

Tabla de contenido