INSTALLATION OF THE APPLIANCE

All installation stages must be considered right from
production of the general layout. Before starting
these stages, as well as deciding the place of instal-
lation, if necessary, the person authorised to carry
out these operations must organise a "safety plan"
to protect the people directly involved, and he must
also ensure strict compliance with all legal require-
ments, especially those relating to mobile work-
sites.
The place of installation must have all the connec-
tions needed to supply the appliance and dispose of
the production residues, must be suitably lit and
must meet all legal health and hygiene require-
ments to prevent the contamination of the foods.
If necessary, fix the exact position of each individual
appliance or subassembly by mark coordinates to
locate them correctly.
Appliances must be at some distance from the
wall at least 5 cm if the wall is not designed to
be resistant to a temperature of at least 150°C.
INSTALLATION OF DISMANTLED PARTS
The appliance is delivered with some components
dismantled and they have to be fitted during instal-
lation. Specifically, the floor-mounted feet must be
fitted (A).
IT
GB
DE
FR
LEVELLING
ES
Adjust the floor-mounted feet (A) to level the appli-
ance.
English
Install in accordance with the relevant legislation,
regulations and specifications in the country of use.
A
- 12 -
IDM-39604014600.tif
A
IDM-39613300700.tif
IDM-39603614000.tif
Tabla de contenido
loading

Este manual también es adecuado para:

1g1pe20g0pe11g0pe10g0pe21g0pe22g0pe2

Tabla de contenido