Install a lightning conductor, see Section '8.3 Electrical installation'.
8.2
Connections
Equipment such as cables and hoses is not supplied and is to be obtained
locally.
Figure 9 shows the normal connections to E-PAK 150 DX/300 DX/500 DX, as
follows:
1.
PS cable for remote start/stop.
2.
Incoming 3-phase power supply with Protective Earth (PE) conductor.
3.
Maintenance switch.
4.
Vent duct flange.
5.
Isolation device.
6.
Vacuum duct from workstations.
7.
Power cable.
8.
Duct between the unit and isolation device.
9.
Water and dirt trap. Compressed air supply is to be clean and dry.
10.
Compressed air valve, size G1/4" or G1/2".
11.
Compressed air line, Ø 6 mm nylon hose.
8.3
Electrical installation
WARNING!
Risk of electric shock.
Work with electric equipment is to be carried out by a qualified electrician.
NOTE!
National and local electric regulations are to be followed.
For electrical data, see Section '5.3.2 Electrical data'. Column F1 gives the
recommended mains fuses (slow) for different supply voltages.
Column S1F gives the settings for the overload relay. These are set when the
unit is tested before delivery but should be verified when installing the unit.
The setting is equivalent to 0.58×the nominal current of the motor.
For the power circuit, control circuit and terminal connection diagrams, see the
following figures:
•
Power circuit diagram, E-PAK 150 DX
•
Power circuit diagram, E-PAK 300 DX/500 DX Figure 22.
•
Control circuit diagram, E-PAK 150 DX
•
Control circuit diagram, E-PAK 300 DX/500 DX Figure 24.
•
Terminal connection diagram,
E-PAK 150 DX/300 DX/500 DX
8.3.1
General requirements
The following items are minimum requirements to ensure the proper function
and required level of protection with regards to equipment category, the EC
E-PAK 150 DX/300 DX/500 DX
Figure 21.
Figure 23.
Figure 25.
EN
35