1. Insert the key in position 1 lock and rotate 90° counter-clockwise (fig. 3)
2. Insert the unlock key in position 2 and rotate clockwise until complete unlock of the pinion (fig. 3).
Before starting installation, you should carry out the following checks, as well as making sure the
structure is compliant with current standards. Specifically:
•
Check that the wall and/or column are in good condition. If they are not, the fastening points
will need to be reinforced.
•
Make sure that the travel of the shutter is not obstructed in any way. The shutter must not
have friction, the movement in aperture and in closure must be free If stopped in any
position it must not move. During movement it must not slip.
•
Follow the dimensions, create a solid concrete footing and fix the base plate to the ground
immerging it into the concrete using the bracket clamps and fixing screws (fig.4). If the base
already exists use robust expanding wedges.
•
Provide one or more pipelines for the laying of electrical cables.
N.B. IT IS NECESSARY TO KNOW THE DIMENSIONS OF THE RATCHET IN ORDER TO CAL-
CULATE WITH PRECISION THE POSITION OF THE COUNTER-PLATE.
MANUAL OPERATION
1_lock
2_unlocking key
INSTALLATION
16
fig.3
fig.4