Before starting installation it is recommended to carry out the following checks and operations:
1) The structure of the gate must be solid and appropriate.
2) During the run, the gate must not present excessive side disbandment.
3) The lower wheels/rail and the higher roller/guide systems must work without excessive friction.
4) To avoid the disbandment of the gate the sliding gate limit devices, both in aperture and in closu
re, and a second higher roller/guide must be installed in compliance with current regulations.
5) In pre-existing gates remove any manual lock.
6) Lay the ducts for the energy supply (Ø25-50mm) and for the outside connection (photocell,
flashing device, key selector, etc.) to the base of the gate.

OVERALL VIEW

5
7

PRELIMINARY CHECKS

1
2
3
4
5
6
7
8
9
10
9
5
1
15
Reduction gear
Flashing device
Antenna
Key selector
Photocell
Bollard
Ratchet
Limit device
Warning notice
Check stop
6
8
3
2
10
Tabla de contenido
loading

Este manual también es adecuado para:

Ind2500kt

Tabla de contenido