Installation; Handling; On The Floor; On The Ceiling - S&P CACB-HP Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3.

INSTALLATION

3.1 Handling

Unpack the box.
To lift it, attach the box with 2 slings to the fixing straps located around the discharge
branch.
3.2 Installation
The box must be attached to a flat support by the side holes provided for this purpose.
It is recommended to install it on vibration absorbers and connect it with flexible
sleeves.
The CACB-HP can be installed either for horizontal discharge or for vertical discharge
by simply flipping the box.
Horizontal discharge
The air tight installation of this box and its network should satisfy the technical conditions defined in DTU 68-2.
Important : Make sure that the motor's square cooling holes (located under the electric connection box) are
not obstructed.

3.2.1 On the floor

Provide for a distance greater than or equal to the
C dimension to allow performing maintenance on
the motorised fan.

3.2.2 On the ceiling

Provide for a height greater than or equal to the C
dimension to allow performing maintenance on
the motorised fan.
ENGLISH
Vertical discharge
12 / 20
NT_518737_CACB-HP_ES-AN-FR_130515.docx
Tabla de contenido
loading

Tabla de contenido