Flotec FPSE 3601A Serie Manual Del Usuario página 4

Bombas sumergibles para el manejo de líquidos con sólidos
Ocultar thumbs Ver también para FPSE 3601A Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Specifications / Performance / Installation
SPECIFICATIONS
FPSE
Model
3601A
PERFORMANCE
5 (1.5m)
FPSE3601A
7320(27,709)
INSTALLATION
(See Figure 1 for Typical Installation instructions.)
Pump must be level when operating. If
motor is tilted, internal start/run switch may overheat and
damage motor.
Risk of electrical shock. Can burn or kill.
Do not lift pump by power cord. See "Cord Lift Warning"
on Page 5. Do not hang pump from discharge pipe or
power cord.
1. Install the pump on a solid, level foundation, or in a
sump pit constructed of tile, concrete, steel or plas-
tic. The recommended minimum diameter of the
Flow
Directional
Arrow
2" Checkvalve
Do Not Mount
Vertically
30"
18"
Figure 1
For parts or assistance, call Flotec Customer Service at
H.P.
Voltage
1/2
115
GPH (LITERS) AT DISCHARGE FT. OF HEAD
10 (3m)
5400(20,441)
115V Properly
Grounded
Outlet
Sump Pit
2" Discharge
Pipe
Be sure the
float switch can
swing through
it's entire arc.
Drill a 3/16"
vent hole here.
Install pump on
a hard, level surface.
3620 1199 S185 Install
Individual Branch Circuit
Required (Amps)
20
15 (4.6m)
20 (6.1m)
2700(10,221)
sump pit is 18" (46cm) diameter and the minimum
recommended depth is 30" (76cm). Check local
codes for approved materials.
NOTICE: Pump should not be installed on clay, earth
or sand surfaces. Clean the area around the pump of
small stones and gravel which could clog the pump.
Keep the pump inlet screen clear.
2. Thread a 2" discharge pipe into the pump 2" NPT
discharge port. Be careful to avoid stripping or cross-
ing threads.
Piping – Effluent Applications
(3/4" or Less Solids)
Piping must be 1-1/2" minimum to carry volume of
pump discharge. Check local codes to determine if a
check valve is required in your system. In cold climates,
check valves are not used to prevent effluent from freez-
ing in piping.
Piping – Sewage Applications
(2" or Less Solids)
In any case, piping must not be smaller than pump
discharge.
When installed in a sewage system, pipe must be capable
of handling semi-solids of at least 2" (5.1 cm) diameter.
The rate of flow in the discharge pipe must keep any
solids present in suspension in the fluid. To meet mini-
mum flow requirements (2 feet (.6 m) per second in dis-
charge line), size pipe as follows:
A Pipe Size Of:
1-1/2" (3.8 cm)
2" (5.1 cm)
2-1/2" (6.3 cm)
3" (7.6 cm)
NOTICE: Use Teflon™ tape on pipe connections. Do
not use ordinary pipe joint compound on plastic pipe or
pump. Pipe joint compound can attack plastics and dam-
age pump.
TM
E.I. DuPont de Nemours and Company Corporation.
1-800-365-6832
Dual Element Time
Delay Fuse Amps
20
25 (7.6m)
Will Handle a Flow Rate Of:
12 GPM (45 LPM)
21 GPM (79 LPM)
30 GPM (113 LPM)
48 GPM (181 LPM)
3
Tabla de contenido
loading

Tabla de contenido