Makita HR2652 Manual De Instrucciones página 6

Martillo combinado con recolección automática de polvo
Ocultar thumbs Ver también para HR2652:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installing the quick change drill
chuck
Check the line of the quick change drill chuck shows
the
symbol. Grasp the change cover of the quick
change drill chuck and set the line to the
Place the quick change drill chuck on the spindle of the
tool. Grasp the change cover of the quick change drill
chuck and turn the change cover line to the
until a click can clearly be heard.
1
4
3
► 1. Quick change drill chuck 2. Spindle 3. Change
cover line 4. Change cover
Selecting the action mode
NOTICE:
Do not rotate the action mode chang-
ing knob when the tool is running. The tool will be
damaged.
NOTICE:
To avoid rapid wear on the mode
change mechanism, be sure that the action mode
changing knob is always positively located in one
of the three action mode positions.
Rotation with hammering
For drilling in concrete, masonry, etc., rotate the action
mode changing knob to the
carbide tipped bit (optional accessory).
► 1. Rotation with hammering 2. Action mode chang-
ing knob
symbol.
symbol
2
symbol. Use a tungsten-
1
2
Rotation only
For drilling in wood, metal or plastic materials, rotate the action mode
changing knob to the
► 1. Rotation only
Hammering only
For chipping, scaling or demolition operations, rotate
the action mode changing knob to the
bull point, cold chisel, scaling chisel, etc.
► 1. Hammering only
Adjusting the nozzle position
Push in the guide while pressing the guide adjustment
button, and then release the button at the desired position.
► 1. Guide 2. Guide adjustment button
NOTE: Before adjusting the nozzle position, release the noz-
zle forward completely by pressing the guide adjustment button.
6 ENGLISH
symbol. Use a twist drill bit or wood drill bit.
1
symbol. Use a
1
1
2
Tabla de contenido
loading

Este manual también es adecuado para:

Hr2653Hr2653tHr2663

Tabla de contenido