Replacing The Neoprene Gasket Of The Sealing Unit Maintenance - Orved N Serie Manual De Uso

Termosoldadora de cubetas en atmósfera modificada
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

ROUTINE MAINTENANCE

10.8 REPLACING THE NEOPRENE GASkET OF THE SEALING UNIT MAINTENANCE

WARNING:
This operation must be carried out by qualified personnel.
1) Lower the sealing head and fix it in the closed position
A
by means of holder
2) Release the two side hooks on the steel cover
3) Remove cover
C
by raising it.
4) Deactivate the electric connector
E
clamping lever
.
5) Disconnect the two tubes (red and black)
on the green or orange plastic ring nut on the union,
pulling the tube at the same time.
6) Unscrew the four knobs
unit.
7) Lift the entire sealing unit
king care to avoid damaging the threaded insertion pins
and the cutting units (blades and film-retainer profiles).
8) Remove gasket
I
and clean the seat to remove residual dirt, if present.
9) Insert the new gasket and press it all the way into the hollow seat.
10) Insert the sealing unit, by centring the four threaded pins
knobs and hook the cover on.
11) Insert the 2 red and black tubes in the two unions, pushing them to fit
flush (approx. 7mm). Insert the electric connector, blocking it by means
of the trip lever.
12) Hook the stainless steel cover, guiding with one hand the corrugated tube
L
on the back into the opening provided in the cover.
G
48
provided on the right side.
D
by acting on the
F
by pushing
G
at the corners of the sealing
H
using the two handles, ta-
G
E
B
.
A
G
, then tighten
F
L
D
Rev. 08 - 04/2017 - Cod. 1500160 - Instruction manual VGP25N / VGP60N
B
C
I
H
Tabla de contenido
loading

Este manual también es adecuado para:

Vgp25nVgp60n

Tabla de contenido