Blower Pipe - RedMax HBZ2601 Manual De Instrucciones

Ocultar thumbs Ver también para HBZ2601:
Tabla de contenido
F1
18
English
5. For safe operation
■ TRANSPORTATION
• Drain the fuel from the fuel tank before transporting
or storing the blower.
• Secure the unit carefully to prevent movement when
it is transported.
• A unit that receives a strong shock during transport
and unloading may malfunction.
■ STORAGE
• When storing the blower, choose a space indoors
free from moisture and out of the reach of children.
English
6. Set up

■ BLOWER PIPE

• Align groove in blower pipe with projection on blower
housing (or another blower pipe) and slide the pipe
onto the blower housing (or another blower pipe).
Rotate the pipe clockwise to lock it into place.
Tabla de contenido
loading

Tabla de contenido