UDHOME2 AF
Abb. 29: Draw on the drill holes
7. Draw the drill holes on the concrete floor and drill them. Then,
insert the anchors.
Abb. 30:
Lever out the pipe entries
8. If necessary, lever out the pre-marked pipe entries with a slot-
ted screwdriver.
Mounting the floor socket
M20
M25
29 | EN