4. Initial setup

1. Affix the stickers enclosed with the tank
documents permanently and firmly to the tank.
DT-Mobil 400 l labelling (front)
DT-Mobil 600 l / 980 l labelling on both sides
(front and rear)
A
UN 1202 for diesel
Hazard label
B
(flame on red background)
2. Fill the tank (see section 5.4).
3. Perform a test filling as described in section 5.5,
4. After completing the test filling, close the filling
B
A

5. Operation

5.1 Storage

Do not expose the DT-Mobil to direct sunlight for
extended periods either during transport or when in
storage. Excessive heating can degrade the quality
of the high-grade plastic container.
If heating produces overpressure in the sealed
container, this overpressure will be released via
the safety valve g .
Suitable storage conditions:
• ambient temperatures from - 10 °C to + 40 °C.
• level surface.
• canopy for storage outdoors

5.2 Loading the filling station

B
A
Screw cap c off filling connection.
The 400 l/600 l container is filled with an auto-
matically closing delivery nozzle. The 980 l con-
tainer is filled with a fixed filling connection. The
limiting value transmitter h must be connected.
The limiting value transmitter is factory-set to a
95 % filling.
but hold the outlet manifold k in the open filling
opening c.
opening tight using the cap.
The filling station is now ready for operation.
Risk of injury!
Door of the pump cabinet or pump
cover must be closed.
Important!
i
- close ball valve of the delivery line d
- close aeration and ventilation
connection f with cap