N.B.: the number indicated when changing parameters only refers to a percentage value affecting the default parameters set
on the electronic board (only during the work phase). These values must be changed in case of poor combustion due - in
many cases - to having purchased pellets other than those used during the thermo-stove testing.
! IMPORTANT
Automatic feed screw loading
To automatically load the feed screw (when the thermo-stove is new and/or the feed screw is empty), perform these operations
starting from the main menu status:
1. Press and hold the P4 key for 2 seconds until the CLOCK SETTING MENU appears
2. Press the P4 key four times: the display will show STOVE STATUS MENU
3. Access via the P6 key: the display shows the desired screen.
2000
130°C 1.5b
FEED SCREW 0
STATUS 0
THE FEED SCREW IS
STOPPED
4. Change the feed screw status with the P5 key to activate pellet load.
2000
130°C 1.5b
FEED SCREW 1
STATUS 0
THE FEED SCREW IS
ACTIVE
Repeat the operation several times until there are pellets inside the brazier.
This can only be done if the thermo-stove is in FINAL CLEANING or OFF mode!!!!
! IMPORTANT
Thermo-stove switch-on
Before switching the thermo-stove on, proceed as follows:
1. Insert the power cable.
2. Set the switch to the back of the thermo-stove to position 1.
3. Make sure the system is connected to the chimney.
4. Make sure that the water system is connected, and that the cold circuit pressure is 1 bar
5. Load the tank with 6 mm pellets
6. Load the feed screw
7. Press P3 for 3 seconds.
At this point, the thermo-stove performs the switch-on phase.
The following wording appears on the display
• IGNITING
• FLAME WAIT
• FLAME PRESENT
• WORK
During the work phase, check the following settings:
• SETTING THE ROOM TEMPERATURE SET POINT
• SETTING THE BOILER WATER TEMPERATURE SET POINT
• SETTING THE PELLET/AIR MIXTURE
Model Rodi Steel Use and Maintenance Manual
THIS FUNCTION IS EFFECTIVE ONLY IF PROPER ADJUSTMENTS WERE MADE DURING THE
THERMO-STOVE TESTING.
AFTER LOADING THE FEED SCREW, EMPTYING THE BRAZIER INTO THE TANK BEFORE
SWITCH-ON IS RECOMMENDED.
Rev.2 31/07/2017
Page71