Palazzetti IDRO Instrucciones De Uso página 45

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

6 INSTALLATION
6.1 INSTALLATION OF RECESSED
GENERATOR (WITH EXTRACTION
BASE)
For installation in structures with marble cladding
or other materials, the stove is equipped with a
frame with sliding runners to make it easier to pull
out the unit for normal inspection and checking of
mechanical and electrical parts.
The ECOFIRE extraction frame is composed of
(Fig. 6.1.1):
stove extraction base frame (A);
smoke discharge vertical rear attachment (K)
Ø 80 mm;
electrical plug (M) ;
side frames (R) for adaptation to cladding.
Installation (Fig. 6.1.1, Fig. 6.1.2, Fig. 6.1.3):
1. Vary the height of the stove using the bolts (D)
located on the uprights of the frame;
2. Level the frame by screwing the claw feet in
or out (S).
3. The lower edge of the stove must be over
the marble cladding surface by at least 1 cm.
4. Make 4 holes Ø 8 to attach the frame to
the ground (Fig. 6.1.3). Use the frame as a
template.
5. Fasten the feet (S) of the base with sturdy steel
expansion plugs Ø 8 mm (E);
6. Connect the discharge manifold (K) to the
smoke outlet duct;
7. Make the combustion air intake;
8. Provide for the incoming electrical line on the
rear of the stove (M);
The water hose support (T) is to be installed on the
right rear part of the stove (Fig. 6.1.1).
cod. 00 477 1490 - 11/2013 - PN - Italy
INSTALLATION
A
S
T
K
D
E
R
Fig. 6.1.1
M
S
Fig. 6.1.2
Fig. 6.1.3
45/172

Capítulos

Tabla de contenido
loading

Tabla de contenido